Crystal Geyser Roxane Cabin Bar Ranch Water Bottling Facility Project

9 Documents in Project

Summary

SCH Number
2011091055
Lead Agency
Inyo County
Document Title
Crystal Geyser Roxane Cabin Bar Ranch Water Bottling Facility Project
Document Type
NOP - Notice of Preparation
Received
Present Land Use
The site is largely open space, but includes a cartaker's residence, roadway, and ancillary uses / OS-40 & RR-1.0 / RP & RRH

Document Description
The Construction of a spring water bottling facility and ancillary uses to be built in three phases over an approximate 10 to 15 year time period. Phase I and Phase II of the project would include the construction of an approximately 198,500-square-foot bottling facility that would house four water bottling lines and eight truck loading docks. Phase I would also include the construction of a 24-foot wide access road that would extend from the proposed bottling facility to an access point along US 385, as well as a leach mound system and stormwater retension basin that would be located east of the proposed bottling faciity. Phase II or Phase III of the proposed project would include the development of an 8.3-acre solar array to reduce the project's use of non-renewable resources and to achieve a Leadership in Energy and Environmental Design (LEED) Green or Certified Level. The proposed solar array would be located on a southeast portion of Cabin Bar Ranch. Phase III would include an approximately 40,250-square-foot storage warehouse south of the bottling facility.

Contact Information
Tanda Gretz
Inyo County Planning Department
P.O. Drawer L
Independence, CA 93526

Phone : (760) 878-0265

Location

Coordinates
36°19'4.1"N 118°1'21.1"W
Counties
Inyo
Cross Streets
US 395 / Cabin Bar Ranch Road
Zip
93549
Total Acres
43.24
Parcel #
Multiple
State Highways
US 395
Railways
Southern Pacific
Waterways
Cartago Creek, Owens Dry Lake
Township
19S
Range
37E
Section
1, 5,6
Base
MtDiablo
Other Location Info
Independence

Notice of Completion

Review Period Start
Review Period End
Development Type
Industrial ( 238,750 Sq. Ft., 50 Employees) Water Facilities (Bottling Fac. Type, 360AFV MGD)
Local Action
General Plan Amendment
Project Issues
Aesthetic/Visual Air Quality Archaeologic-Historic Biological Resources Noise Traffic/Circulation Water Quality Water Supply Wetland/Riparian Land Use Cumulative Effects Other Other Issues: Greenhouse Gas
Reviewing Agencies
Air Resources Board, Major Industrial Projects California Department of Parks and Recreation California Department of Public Health California Energy Commission California Highway Patrol California Public Utilities Commission California State Lands Commission Department of Water Resources Office of Historic Preservation Resources Agency California Native American Heritage Commission California Department of Fish and Wildlife, Inland Deserts Region 6 California Department of Transportation, District 9 California Regional Water Quality Control Board, Lahontan Victorville Region 6

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print