Citywide Pipeline Projects 2011
29 Documents in Project
Summary
SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Citywide Pipeline Projects 2011
Document Type
ADM - Addendum
Received
Present Land Use
Citywide
Document Description
Note: FYI
Installation of ~ 19,113 linear feet (LF) (3.62 miles) of a new, 36-inch diameter cement mortar lined & tape coated (CML&TC) steel pipeline and replacement of `16,051 LF (3.04 miles) of existing 16-inch diameter Polyvinyl Chloride (PVC). The project also includes some or all of the following improvements: installation of curb ramps, fire hydrants, valves, water meters, water boxes, water services, and slurry and street resurfacing. The Morena Pipeline project is part of the City of San Diego's on-going Sewer Main and Water Main Replacement Program (Citywide Pipelines Project MND No. 255100). This addendum is to be posted for 15 days.
Contact Information
Name
Mark Brunette
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Regions
Citywide
Cross Streets
Morena Blvd between Balboa Ave and Friars Rd.
Zip
92117
State Highways
I-5
Waterways
Tecolote Creek/Mission Bay
Notice of Completion
Development Types
Other (Water Pipeline Replacement and Construction)
Local Actions
System Improvement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Mineral Resources, Noise, Population/Housing, Public Services, Septic System, Sewer Capacity, Transportation, Vegetation, Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.