Bay Ho Improvements 2

29 Documents in Project

Summary

SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Bay Ho Improvements 2
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2024
Document Description
The project proposes to replace existing water mains and sewer mains along with road improvements within the public right-of-way and existing city easements. Construction of Bay Ho Improvements 2 would consist of the installation of approximately 16, 166 LF (3.06 miles) of 8-inch sewer mains, 2,924 LF (0.55 miles) of rehab sewer mains. The abandonment of 7,243 LF (1.37 miles) of 8 and 15 Inch (VC) mains. The Installation of approximately of 7,248 LF (1.37 miles) 8-inch and 12-inch AC water mains. The abandonment of approximately 2,520 (0.48 miles) of 8-inch and 12-inch water mains, including all associated water services, fire hydrants, laterals, manholes, replumblng, curb ramps, traffic control, trench restoration, pavement resurfacing and all other work and appurtenances in accordance with the specifications and drawings.

Contact Information

Name
Roberto Valadez
Agency Name
City of San Diego
Job Title
Associate Engineer
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Other Location Info
Construction of the project would be located along portions of Avati Drive, Barrows Street, Brill den Court, Cadden Way, Caflur Avenue, Conner Way, Driscoll Drive, Fox Place, Fryden Way, Geddes Drive, Hartman Way, Huerfano Avenue, Huerfano Court, Hunrlchs Way, Kam loop Avenue, Karnes Way, La Crosse Avenue, Monair Drive, Moraga Avenue, Morena Boulevard, Moraga Court, North Star Drive, Nute Way, Paducah Drive, Peters Way, Plone Way, Raffee Drive, Slayden Way, Southview Drive, Stockett Way, Tacoma Street, Tenshaw Place, Wicoee Place, and Yucca Avenue rights-of-way.

Notice of Determination

Approving Agency
City of San Diego Development Services Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.sandiego.gov/ceqa/final

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Mitigated Negative Declaration )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print