Encanto Improvements 2

27 Documents in Project

Summary

SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Encanto Improvements 2
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2024
Document Description
Encanto Improvements 2 project Is part of the City's on-going Sewer Main and Water Main Replacement Program. The existing sewer and water mains are old and are nearing the end of their service life. Construction of the project would reduce maintenance requirements, correct hydraulic deficiencies, improve reliability and accessibility, and bring the sewer and water main systems up to current design standards. The project would construct water, sewer, and road improvements within the City's public right-of-way and existing City easements on various streets: Thrush Street, Linnet Street, Balmoral Drive, 59th Street, Kings View Court, Kenwood Street, Brooklyn Avenue, Iona Drive, Merlin Drive, 60th Street, 62nd Street, Akins Avenue, 61st Street, Fergus Street, Wunderlin Avenue, 63rd Street, within the Encanto Neighborhoods Community Plan Area, Council District 4. The project proposes installing approximately 12,437 linear feet (LF) of 8-lnch diameter sewer mains, and approximately 9,116 LF of 8-lnch diameter water mains; including all associated water services, fire hydrants, laterals, manholes, replumblng, curb ramps, traffic control, trench restoration, and pavement resurfacing.

Contact Information

Name
Pedro Melo Rodriguez
Agency Name
City of San Diego
Job Title
Associate Engineer
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Other Location Info
The project ls located within the Encanto Neighborhoods Planning Area. Surrounding land uses include existing residential developments. The project would occur within developed public rights-of-way and public utility easements located within previously disturbed private property. The project would generally be located within the following streets: Thrush Street, Imperial Avenue, Linnet Street, Balmoral Drive, 59th Street, Kings View Court, Kenwood Street, Brooklyn Avenue, Iona Drive, Merlin Drive, 60th Street, 62nd Street, Akins Avenue, 61st Street, Fergus Street, Wunderlin Avenue, and 63rd Street.

Notice of Determination

Approving Agency
City of San Diego Engineering & Capital Projects Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.sandiego.gov/ceqa/final

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print