Sewer Group 793A
29 Documents in Project
Summary
SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Sewer Group 793A
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2024
Document Description
Sewer and Water Group 793A project is part of the City's on-going Sewer Main and Water Main Replacement Program. The existing sewer and water mains are old and are nearing the end of their service life. Construction of the project would reduce maintenance requirements, correct hydraulic deficiencies, improve reliability and accessibility, and bring the sewer and water main systems up to current design standards.
The project proposes the abandonment of 297 linear feet of sewer main and the replacement of 12,303 linear feet of existing 6-lnch and 8-lnch vitrified clay (VC) and concrete pipe (CP) sewer mains with 8-lnch and 10-lnch polyvinyl chloride (PVC) sewer mains. Additionally, 323 sewer laterals would be reconnected to the new sewer pipelines, two of which are located on private property. The project also includes the replacement of 5,300 linear feet of 8-lnch asbestos cement (AC) water mains with 6-inch, 8-inch and 12-inch PVC water mains. Additionally, 71 water services would be reconnected to the new water pipelines and 10 fire hydrants and 5 fire services would be replaced. The project would also Include the Installation of 14 new manholes, curb ramps, alley aprons and cross gutters, laterals, cleanouts, water services, slurry seal, street resurfacing and striping. The project would also remove two street trees
to accommodate the curb ramps.
Trenches would be approximately three feet In width and would not exceed 15 feet In depth. Construction methods would Include open trenching, tunneling, and pipeline abandonment. During the construction phase of the project, it is estimated that work hours would be between 8:30 a.m. and 3:30 p.m., Monday through Friday. The contractor would comply with the requirements in the Standard Specifications for Public Works Construction, Construction materials would be stored In the related streets and alleys as the work progresses.
The project would comply with the requirements described In the Standard Specifications for Public Works Construction, and California Department of Transportation's Manual of Traffic Controls for Construction and Maintenance Work Zones. A traffic control plan would be prepared and Implemented in accordance with the City of San Diego Standard Drawings Manual of Traffic Control for Construction and Maintenance Work Zones. Best Management Practices would be required and specified within the approved Water Pollution Control Plan for erosion control and storm drain inlet protection.
Contact Information
Name
Thomas Park
Agency Name
City of San Diego
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
San Diego
Counties
San Diego
Regions
Citywide
Other Location Info
The project is located within the Southeastern San Diego Planning Area. Surrounding land uses include existing residential, institutional, and commercial developments. The project would occur within developed public rights-of-way and public utility easements located within previously disturbed private property.
The project would generally be located within the following streets: 19th Street between G Street and Island Avenue; 20th Street between G Street and J Street; 21st Street between G Street and K Street; 22nd Street between G Street and Market Street, and J Street to K Street; 24th Street between G Street and L Street; 25th Street between J Street and L Street; G Street between 22nd Street and 24th Street; an unnamed alley between G Street and Market Street from 24th Street to 25th Street; Market Street between 19th Street and 20th Street, and 22nd Street and 24th Street; an unnamed alley between Market Street and Island Avenue from 24th Street and 25th Street; an unnamed alley between Island Avenue and J Street from 24th Street to 25th Street; an unnamed alley between J Street and K Street from 24th Street to 25th Street; K Street from 22nd Street to an unnamed alley between 25th Street and 26th Street; and an unnamed alley between K Street and L Street from 24th Street to 25th Street.
Notice of Determination
Approving Agency
City of San Diego Development Services Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue, San Diego, CA 92101
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.