Pipeline Rehabilitation BA-1

29 Documents in Project

Summary

SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Pipeline Rehabilitation BA-1
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2021
Document Description
The project would consist of the trenchless rehabilitation of approximately 24,673 linear feet (4.67 miles) of existing 8, 10, and 12-inch diameter vitrified clay sewer mains identified as needing maintenance and rehabilitation due to age and deterioration. In addition, approximately 4,236 linear feet (0.80 miles) of rehabilitated pipe will include seventeen (17) point repairs coming to a total of approximately 28,909 linear feet (5.48 miles) of rehabilitated 8, 1 O, and 12-inch sewer mains. The project also includes approximately 33 manhole rehabilitations, 30 new sewer main cleanouts, 6 manholes to be replaced-in-place, 3 new manholes, and 633 lateral rehabilitations. Point repairs, new cleanouts, new manholes, and manholes to be replaced-in-place would require open trenching within the existing utility alignments. Open trenching will occur within the paved right of way and within city easements on private property.

Contact Information

Name
Karen Bucey
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Total Acres
4.67

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
1222 1st Avenue, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Subsequent Action)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.