Water and Sewer Group Job 1052A

29 Documents in Project

Summary

SCH Number
2011091045
Lead Agency
City of San Diego
Document Title
Water and Sewer Group Job 1052A
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2021
Document Description
The proposed scope of work would Include water and sewer pipe replacement, new installation and abandonment. Approximately 9,473 LF of the existing 4-, 6-, 8-, 12-, and 16-inch diameter Asbestos Clay (AC) distribution water mains will be replaced with -Polyvinyl Chloride (PVC) pipes. Approximately 1,878 LF of AC water mains will be abandoned, and approximately 493 LF of new water pipes, Including associated water services, will be · installed. Approximately 2,315 LF of existing 6- and 8-inch diameter Vitrified Clay (VC) Concrete and PVC pipes sewer pipes will be replaced with PVC pipes. New installation will also include 1,041 LF of 8-inch PVC sewer mains, Approximately 1,008 LF of existing 6- and 8-inch PVC and VC sewer pipes will be abandoned, including associated sewer laterals, manholes, cleanouts, top hats and other associated work. The project Includes the replacement of approximately 9 existing manholes, the installation of approximately 21 new manholes, the installation of approximately 12 new replumbed laterals, the replacement of approximately 62 laterals and the installation of new lateral clean outs where necessary.

Contact Information

Name
Karen Howard
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Zip
92101

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
1222 1st Avenue, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Subsequent Action)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.