Lakeland Village Master Drainage Plan Line 11, Stage 1

5 Documents in Project

Summary

SCH Number
2011091017
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Lakeland Village Master Drainage Plan Line 11, Stage 1
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2018
Present Land Use
Various. Refer to IS
Document Description
The proposed project consists of the construction, operation, and maintenance of Lakeland Village MDP Line 11, Stage 1. This MDP facility was analyzed in the previously certified Lakeland Village MDP Final Programmatic Environmental Impact Report. The proposed project is approx. 4,300 feet long and consists of underground storm drains and a sediment basin. An Addendum to the FEIR was prepared to address the modifications to the proposed MDP facility analyzed in the Final PEIR. After evaluation of the proposed project, it was determined that none of the conditions described in Section 15162 of the CEQA Guidelines calling for the preparation of a subsequent MND or EIR have occurred, and further CEQA review is not required.

Contact Information

Name
Randy Sheppeard
Agency Name
Riverside County Flood Control and Water Conservation
Contact Types
Lead/Public Agency

Location

Cities
Wildomar
Counties
Riverside
Total Acres
13 s/m
State Highways
SR 74
Waterways
Lake Elsinore
Township
Var.
Range
Var.
Section
Var.
Base
Var.
Other Location Info
City/Nearest Community: Lakeland Village

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print