Lakeland Village Master Drainage Plan (MDP)

5 Documents in Project

Summary

SCH Number
2011091017
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Lakeland Village Master Drainage Plan (MDP)
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2018
Present Land Use
Various. Refer to IS

Document Description
The Riverside County Flood Control and Water Conservation District (District) proposes to implement the Lakeland Village Master Drainage Plan (MDP). Implementation of the MDP consists of three (3) separate components: Administration of the MDP - The MDP will be a guide for the alignment, type, size, and cost of major existing and proposed MDP facilities within the watershed to address the current and future drainage needs of Lakeland Village and the surrounding area. Future construction of the MDP facilities - The MDP identifies the approximate location, size, and type of MDP facilities needed to alleviate and control flooding within the Project boundary. Future operations and maintenance of the MDP facilties - Once a facility is constructed, it will require maintenance in order to retain flood control capacity. It is expected that the District will operate and miantain all the MDP storm drains, channels, and basins.

Contact Information
Mike Wong
Riverside County Flood Control and Water Conservation
1995 Market Street
Riverside, CA 92501

Phone : (951) 955-1233

Location

Cities
Wildomar
Counties
Riverside
Total Acres
13 s/m
State Highways
SR 74
Waterways
Lake Elsinore
Township
Var.
Range
Var.
Section
Var.
Base
Var.
Other Location Info
City/Nearest Community: Lakeland Village

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
4080 Lemon St., Riverside, CA 92501

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search