University Tower 1st Floor Remodel

Summary

SCH Number
2011088349
Public Agency
University of California, Davis
Document Title
University Tower 1st Floor Remodel
Document Type
NOE - Notice of Exemption
Received
Posted
8/25/2011
Document Description
The University Tower 1st Floor Remodel project will remodel approximately 14,668 square feet of the existing Main Hospital building at the UC Davis Medical Center campus on Stockton Boulevard in Sacramento. The space to be remodeled was previously a short stay inpatient unit with 24 beds. The remodeled space will accommodate the existing clinical departments of Dialysis and Aphaeresis with a total of 20 treatment stations and no beds. The proposed project consists of repair maintenance, and minor alterations to an existing structure and is considered categorically exempt from further CEQA review (CEQA Guidelines 15301). In addition, none of the exceptions for application of a categorical exemption apply to this project.

Contact Information

Name
Tom Rush
Agency Name
University of California, Davis
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301
Reasons for Exemption
Existing Facilities.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print