Moreland School District Office and Moreland Middle School Solar Installation

Summary

SCH Number
2011088120
Lead Agency
Moreland School District
Document Title
Moreland School District Office and Moreland Middle School Solar Installation
Document Type
NOE - Notice of Exemption
Received
Posted
8/12/2011

Document Description
The project will consist of installation of a solar array, comprising 1977 panels of about 17.5 square feet each, for a total of approximately 34,860 square feet. Panels would be slightly titled (about five degrees) from horizontal to improve system output, dust and dirt collection, and allow better drainage and cleaning. To the extent practicable, they would be positioned on the flat portion of existing building roofs or the angled portion of roofs facing the interior of the site to minimize their visibility from neighboring residences and adjacent streets. As part of the project, renewable energy curriculum would be developed. The project will provide an alternative source of electricity to power operation of the site, thereby reducing greenhouse gases from the use of fossil fuels.

Contact Information
Dana Taylor
Moreland School District
4711 Campbell Avenue
San Jose, CA 95130-1790

Phone : (408) 874-2922

Location

Cities
San Jose
Counties
Santa Clara

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301,15303,15304
Reasons for Exemption
Existing Facilities, New Construction, Minor Land Alteration.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print