Vallego Baylink Ferry Terminal Maintenance Dredging Project
Summary
- SCH Number
- 2011088042
- Lead Agency
- Fish & Game #3
- Document Title
- Vallego Baylink Ferry Terminal Maintenance Dredging Project
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 8/4/2011
- Document Description
- The project includes maintenance dredging of sediment from the Baylink Ferry Terminal to a depth of 15 feet below mean lower low water (MLLW) in order to facilitate regional water transit service. Approximately 10,310 cubic yards of material will be removed from the channel using hydraulic dredge equipment (clamshell method). Dredged material will be placed in a dredge material scow (barge) and transported to Disposal Area SF-9 located in the Carquinez Strait. The project also includes installation and subsequent removal of a temporary passenger loading facility and gangway. Issuance of a Streambed Alteration Agreement Number 1600-2011-0208-3 is pursuant to Fish and Game Code Section 1602.
- Contact Information
-
Brenda Blinn
California Department of Fish and Game
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558
Phone : (707) 944-5541
Location
- Cities
- Vallejo
- Counties
- Solano
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- C:4;S:15304
- Reasons for Exemption
- The project is maintenance dredging where the spoil is deposited in spoil area authorized by all applicable state and federal regulatory agencies.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.