Southport Sacramento River Early Implementation Project

18 Documents in Project

Summary

SCH Number
2011082069
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
Southport Sacramento River Early Implementation Project
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2017
Present Land Use
Agricultural
Document Description
The WSAFCA is proposing the Southport Sacramento River Early Implementation Project to implement flood risk-reduction measures along the Sacramento River South Levee in the city of West Sacramento, Yolo County, CA. The study area encompasses the area of levee risk-reduction measure construction along the river corridor, roadway construction and/or relocation, and potential soil borrow sites. The project would bring the levee up to standard with federal and State flood protection criteria, as well as providing opportunities for ecosystem restoration and public recreation. The CA State Lands Commission action is an approval of a 20 year General Lease - Public Agency Use through Feb. 6, 2037.

Contact Information

Name
Mary Jo Columbus
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
Jefferson Blvd. at West Sacramento City limits
Zip
95691
Total Acres
119
Parcel #
044-020-02
State Highways
84
Waterways
Sacramento River, Deep Water Ship Channel
Township
8N
Range
4E
Section
31

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print