Southport Early Implementation Project (Lake or Streambed Alteration Agreement No. 1600-2016-0022-R3)

14 Documents in Project

Summary

SCH Number
2011082069
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
Southport Early Implementation Project (Lake or Streambed Alteration Agreement No. 1600-2016-0022-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0022-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, West Sacramento Area Flood Control Agency. Project is limited to implementing flood risk-reduction measures along the Sacramento River South Levee such as setback levees, slope flattening, seepage berms, slurry cutoff walls, levee slope bank stabilization, and utilities and operations and maintenance (O&M) easements. Additional project elements include erosion site repairs on the existing levee, encroachment removal, marina access ramp construction, corrugated metal pipe removal, breaches to the existing levee to open the offset areas to Sacramento River flows, offset area bank stabilization and revegetation, borrow material excavation from neighboring open and agricultural land, structure and road demolition, and vegetation removal.

Contact Information
Andrea Boertien
CDFW
7329 Silverado Trail
Napa, CA 94558

209-234-3449

Location

Coordinates
38°30'08.1"N 121°34'55.3"W
Cities
West Sacramento
Counties
Yolo
Cross Streets
Jefferson Blvd. at West Sacramento City limits
Zip
95691
Total Acres
119
Parcel #
044-020-02
State Highways
84
Waterways
Sacramento River, Deep Water Ship Channel
Township
8N
Range
4E
Section
31

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No