Village Parkway Project

16 Documents in Project

Summary

SCH Number
2011082069
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
Village Parkway Project
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2016
Present Land Use
Agricultural

Document Description
Since certification of the Southport EIP Final EIR, WSAFCA has identified the Borrow One Site as containing material needed to construct the Southport project. Up to 300,000 cy of borrow material would be removed from the Borrow One site to support levee work associated with the Southport project. To provide material sufficient to return the Borrow One parcel to agricultural production following the completion of borrow activities for levee construction, an approximately 25 acre pond would be excavated on the eastern portion of the site, and the excavated material used to backfill excavated areas on the remainder of the site. The permanent pond would provide irrigation and drainage for the Borrow One site.

Contact Information
Greg Fabun
West Sacramento Area Flood Control Agency
1110 West Capitol Avenue
West Sacramento, CA 95691

Phone : (916) 617-4855

Location

Coordinates
38°30'08.1"N 121°34'55.3"W
Cities
West Sacramento
Counties
Yolo
Cross Streets
Jefferson Blvd. at West Sacramento City limits
Zip
95691
Total Acres
119
Parcel #
044-020-02
State Highways
84
Waterways
Sacramento River, Deep Water Ship Channel
Township
8N
Range
4E
Section
31

Notice of Determination

Approving Agency
West Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1110 West Capitol Ave., West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes