Congeneration Plant Replacement Project Phase 1

4 Documents in Project

Summary

SCH Number
2011082037
Lead Agency
University of California
Document Title
Congeneration Plant Replacement Project Phase 1
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Campus Support (under the UC Santa Cruz 2005 Long Rnage Development Plan)
Document Description
The Project would replace the UC Santa Cruz Campus' existing cogeneration equipment with a new, 4.2 megawatt natural gas-fueled combustion turbine generator. Waste heat from electricity generation would be used to pre-heat water for campus boilers. The equipment would be installed in a new, 4,250 sf building adjacent to the existing cogeneration plant. The existing cogeneration equipment would be decommissioned when the new equipment is operational. The project also includes upgrades to the Campus electrical system to accommodate the new facility. The project would require improvements to the PG&E natural gas distribution line serving the campus to provide adequate, reliable pressure in the gas line that serves the cogeneration plant. The Campus would obtain a timberland conversion permit and prepare a timber harvest plan.

Contact Information

Name
Sally Morgan
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive/Heller Drive
Zip
95064
Total Acres
.4
Parcel #
001-011-13
State Highways
Hwy 1, 17, 9
Schools
Westlake ES
Waterways
Jordan Gulch
Township
11S
Range
2W
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, Cal Fire, California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Water Resources, Resources Agency
Development Types
Power:Other Power Type (gas turbine)(Megawatts 4.2)
Local Actions
design approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wildfire, Climate Change

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print