Asti Bank Stabilization and Fish Habitat Enhancement Project

3 Documents in Project

Summary

SCH Number
2011082004
Lead Agency
Sotoyome Resource Conservation District
Document Title
Asti Bank Stabilization and Fish Habitat Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2011
Present Land Use
Land Intensive Agriculture
Document Description
Lay back the vertical, destabilized sections of river bank in the section of the banks above and below the ordinary high water mark at a 2.5 to 1 slope, to install live-willow brush mattresses on the laid-back banks, excavate lateral trenches perpendicular to river low and embed rock baffles every 38 feet within the willow mattresses, and to excavate a toe trench in-water to be back filled with large rock at the foot of the willow mattresses. Incorporate and secure trees which have previously fallen into the river and created complex habitat along the shoreline at the base of the vertical banks. Boulder wing-wall current deflectors, sprigged with willow stakes, at the upstream end of the action areas. Gravel obtained from the west bank, on the property, will be placed around the cover the live-willow brush mattresses, providing the willows a rooting medium.

Contact Information

Name
Stephen Bargsten
Agency Name
No. RWQCB
Contact Types
Lead/Public Agency

Location

Cities
Cloverdale
Counties
Sonoma
Zip
95425
Total Acres
.176
Parcel #
118-020-007
Airports
Cloverdale Municipal
Waterways
Russian River
Township
11N
Range
10W

Notice of Determination

Approving Agency
No. RWQCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print