I-5 Riverfront Reconnection Project

2 Documents in Project

Summary

SCH Number
2011082001
Lead Agency
City of Sacramento
Document Title
I-5 Riverfront Reconnection Project
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2011
Present Land Use
GPD: Traditional Center, Central Business District, Public/Quasi-Public, and Parks and Recreation. Z: Central Business District Zone-Special Planning District and Light Industrial Zone.
Document Description
The I-5 Riverfront Reconnection Project consists of augmenting existing multi-modal connections between the Downtown and Riverfront/Old Sacramento areas including along Capitol Mall, the Crocker Art Museum campus, the Riverfront areas, and between Capitol Mall and the northern part of 2nd Street into the Old Sacramento Historic District. This would be accomplished by constructing an additional I-5 overcrossing at N Street, converting a portion of existing Neasham Circle into a bicycle/pedestrian-only facility between Front Street and 2nd Street, constructing a viaduct (raised roadway) above the existing Neasham Circle south of Capitol Mall, and creating a 2nd Street connector as a new connection into Old Sacramento from Capitol Mall. The interface between the Front Street viaduct/2nd Street Connector and Capitol Mall would result in a new intersection. The existing slip ramps connecting N Street and L Street with Capitol Mall will be closed and the street pavement for the ramps may be removed. The project also consists of adding a sidewalk on the south side of the existing O Street overcrossing, adding sidewalk along the south side of existing N Street between I-5 and 3rd Street, and adding bicycle lanes and widened sidewalks on the existing Capitol Mall overcrossing.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento, Community Development Dept., Planning Div.
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
L St. on the north, Front St. on the west, O St. on the south and 3rd St. on the east
Zip
95814
State Highways
I-5, I-80, CA-50
Railways
Amtrak, UPRR
Schools
Jedediah Smith ES, William Land ES, The MET Sacramento
Waterways
Sacramento River

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print