MCC Cement Facility Modification Project - HDP #06-162

5 Documents in Project

Summary

SCH Number
2011081098
Lead Agency
Long Beach, City of (City of Long Beach)
Document Title
MCC Cement Facility Modification Project - HDP #06-162
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2015
Present Land Use
City of Long Beach Port - Related Industrial (IP), Port Master Plan Harbor District 8, Southeast Harbor District.

Document Description
The Proposed Project involves modifications to the existing MCC Cement Facility, and consists of installing an emission control system (DoCCS) to capture and reduce NOx emissions from ship auxiliary generators at berth, constructing four, 10,000 metric ton storage and truck loading silos, and upgrading existing facilities and ship unloading equipment. MCC Terminal, Inc. (MCC) proposes to construct the additional cement storage silos and truck loading equipment in a vacant adjacent area at 1120 Pier F Avenue that was formerly used as the warehouse for Pacific Banana operations. MCC's current 4.21-acre site would be enlarged to 5.92 acres.

Contact Information
Janna Watanabe
City of Long Beach
4801 Airport Plaza Drive
Long Beach, CA 90815

Phone : (562) 283-7100

Location

Coordinates
33°44'55"N 118°12'47"W
Cities
Long Beach
Counties
Los Angeles
Cross Streets
Pier F Avenue and Harbor Plaza
Zip
90802
Total Acres
5.9
State Highways
SR 47, I-710
Waterways
Long Beach Harbor

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Port of Long Beach, 4801 Airport Plaza Drive, Long Beach, CA 90815

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes