Mira Loma - Beach Street Storm Drain

2 Documents in Project

Summary

SCH Number
2011081090
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Mira Loma - Beach Street Storm Drain
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2011
Present Land Use
Rural Community-Low Density Residential
Document Description
The Riverside County Flood Control and Water Conservation District proposes to construct, operate and maintain an underground storm drain comprised of an approximately 5,000 lineal feet of reinforced concrete pipe mainline ranging in diameter from 24-inches to 78-inches, a short length of reinforced concrete box south of 58th street, approximately 1,200 lineal feet of RCP laterals ranging in diameter from 18-inches to 36-inches, and minor appurtenances (i.e. connector pipes and catch basins) within street Right of Way and easements in private property. The Project will also include the relocation of approximately 1500 lineal feet of an 8-inch and 10-inch diameter sewer mainline, relocation of approximately 200 lineal feet of an 8-inch and 24-inch waterline, and construction of 24-feet wide pavement on the existing unpaved 54th Street from Rutile Street to Beach Street.

Contact Information

Name
Kris Flanigan
Agency Name
Riverside County Flood Control and Water Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
58th Street, 53rd Street, Beach Street
Zip
92509
Total Acres
5.07
State Highways
Hwy 60
Railways
UPRR
Schools
Mira Loma MS, Van Buren ES
Waterways
Pyrite Channel
Township
2
Range
6
Section
22
Base
SBB&M
Other Location Info
City/Nearest Community: Jurupa Valley

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print