Action Water Treatment Plant / Palmdale Water District (PWD) Intertie Project

2 Documents in Project

Summary

SCH Number
2011081087
Lead Agency
Antelope Valley-East Kern Water Agency (AVEK)
Document Title
Action Water Treatment Plant / Palmdale Water District (PWD) Intertie Project
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2011
Present Land Use
Dedicated Street Right of Way & Water Treatment and Supply Sites
Document Description
The project consists of a water system intertie between AVEK and PWD. Proposed construction consists of the installation of a 10 inch raw water main and a 20 inch potable water main along Sierra Highway from AVEK's existing Action Water Treatment Plant to PWD's points of connection at Barrel Springs Road for the Potable water main and the Palmdale Ditch for the raw water main. Installation of the proposed pipelines will be contained within dedicated right-of-way along paved roads and graded shoulders. Installation of the proposed underground turnouts will be contained within the Agency's existing Action Water Treatment Plant.

Contact Information

Name
Dan Flory
Agency Name
Antelope Valley-East Kern Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Palmdale
Counties
Los Angeles
Cross Streets
Sierra Highway and Barrel Springs Road
Zip
93551
Total Acres
1 +/-
State Highways
Hwy 14
Railways
UPRR
Airports
No
Schools
No
Waterways
Palmdale Lake & Palmdale Ditch
Township
5N
Range
11W
Section
2 & 11
Base
SBB&M

Notice of Determination

Approving Agency
Antelope Valley-East Kern Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.