Bush Minor Subdivision; 3200 21125 (TPM)

2 Documents in Project

Summary

SCH Number
2011081064
Lead Agency
San Diego County
Document Title
Bush Minor Subdivision; 3200 21125 (TPM)
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2011
Present Land Use
(CUDA) Current Urban Development Area, Land Use Designation (1) Residential, Rural Residential 1
Document Description
The project is a Tentative Parcel Map to subdivide 9.3 acres into four residential lots and a remainder lot ranging from 1.0 to 4.8 gross acres in area. The project site is subject to the General Plan Regional Category Current Urban Development Area. The site currently contains a single-family home that will remain. The site will be accessed by a private road easement connecting directing to Pepper Drive. The project would be served by imported water from the Helix Water District and sewer from the Wintergardens Sanitation Maintenance District. The remainder parcel would continue to be served by an existing onsite waste water disposal system. An 800 foot extension of sewer utilities and a 30 ft. extension of water utilities will be required by the project. Proposed grading will consist of 6,600 cubic yards of cut and 6,600 cubic yards of fill.

Contact Information

Name
Kristina Jeffers
Agency Name
San Diego County
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Pepper Drive and Summerlane Street
Zip
92021
Total Acres
9.34
Parcel #
388-230-62-00
State Highways
SR-67, I-8
Airports
Gillespie Field
Schools
Yes
Other Location Info
City/Nearest Community: Lakeside

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print