Trumble Office/Warehouse and Equipment StorageLake - Plot Plan No. 2011-003
2 Documents in Project
Summary
SCH Number
2011081046
Lead Agency
City of Menifee
Document Title
Trumble Office/Warehouse and Equipment StorageLake - Plot Plan No. 2011-003
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2012
Present Land Use
The project site is vacant disturbed land. The General Plan designation is Heavy Industrial. The zoning classification is Specific Plan.
Document Description
Plot Plan 2011-003 is a proposal for the construction of two industrial buildings (21,730 and 40,000 s.f. respectively), a caretaker's unit within the office/warehouse building and outdoor equipment storage. Infrastructure improvements include constructing ultimate improvements on Antelope Road to result in an ultimate 50 foot half width right-of-way section. The north driveway is designated as the main entrance. Secondary access is provided by a south driveway, also along Antelope Road.
Contact Information
Name
Keith Gardner
Agency Name
City of Menifee, Planning Department
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Menifee
Counties
Riverside
Cross Streets
South of Ethanac Road, west of Antelope Road and east of Interstate 215
Zip
92585
Total Acres
5.01
Parcel #
331-150-044
State Highways
Hwy 215
Railways
Perris Line
Schools
Romoland ES
Township
5S
Range
3W
Section
15
Base
SBB&M
Notice of Determination
Approving Agency
City of Menifee Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.