Operation of Trabuco Canyon Water District (District) - Saddle Crest Reservoir and Booster Pump Station Project (Project)

7 Documents in Project

Summary

SCH Number
2011081028
Lead Agency
Orange County
Document Title
Operation of Trabuco Canyon Water District (District) - Saddle Crest Reservoir and Booster Pump Station Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2019
Document Description
The District proposes to construct a new water storage reservoir tank and a booster pump station to serve the Saddle Crest Homes development. The above-ground 1.5 million-gallon (MG) steel water tank, pump station, related infrastructure will allow the District to pump water from their existing system to feed the new reservoir at a higher elevation and serve the new housing development with a gravity system to meet fire flow and domestic water service requirements. (Site preparation will be required to sub-grade and compact the soils of the Project site, and the booster pump station will be located approximately 50-feet west of the steel water tank.) See NOD for Full Details.

Contact Information

Name
Ashley Dummer
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Name
Agency Name
County of Orange
Contact Types
Project Applicant

Location

Counties
Orange
Other Location Info
The Saddle Crest Homes development includes construction of 65-single-family homes on approximately 113. 7 acres located within the foothills of the Santa Ana Mountains in the southeast Orange County north of the junction of Live Oak Canyon Road with El Toro Road and east of Santiago Canyon Road. Cleveland National Forest is adjacent and north of the Saddle Crest Homes development site, Santiago Canyon Estates is located to the east; it is bounded on the south by Santiago Canyon Road and the City of Lake Forest with Limestone-Whiting Wilderness Park; and an existing residential estate is generally located along the western boundary. To minimize environmental impacts to the Project area, the homes will be clustered within the southwestern portion of the site while approximately one-third of the site will be preserved as open space. The Project reservoir site and booster pump station are located on a 0:52-acre site near the northern border of the construction area in Lot-68, within the Saddle Crest Homes development, north of the street that will be called Auburn Hills.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print