Waddell Conditional Use Permit DRC2008-00110
2 Documents in Project
Summary
SCH Number
2011081026
Lead Agency
San Luis Obispo County
Document Title
Waddell Conditional Use Permit DRC2008-00110
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2011
Present Land Use
Agricultural
Document Description
Request by Duane Waddell (Swallow Creek Ranch) for a CUP and Development Plan/Coastal Development Permit to all temporary events. The proposed temporary events would involve up to 20 events during per calendar year and include the following:
- 5 events with a maximum of 100 guests;
- 5 events with a maximum of 125 guests;
- 9 events with a maximum of 150 guests; and
- 1 event with a maximum of 200 guests.
The temporary events would be located within a 2.35-acre event area which is part of a 617 acre parcel. The site is located in the coastal zone and the inland portion of the County. The event area includes: an existing barn (4,320 s.f.), two designated outdoor event areas (31,400 and 40,000 s.f.), and an area for parking (26,670 s.f.); all of which are located within the coastal zone. Access to the barn and one of the event areas will be through the inland portion of the property east of the barn.
Contact Information
Name
Jamie Kirk
Agency Name
San Luis Obispo County, Dept. of Planning & Building
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Cross Streets
Hwy 1
Total Acres
617
Parcel #
046-161-012
State Highways
Hwy 1
Other Location Info
City/Nearest Community: Cayucos
Notice of Determination
Approving Agency
San Luis County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes