Recycled Water System Expansion
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011081018
- Lead Agency
- City of San Clemente
- Document Title
- Recycled Water System Expansion
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/4/2012
- Present Land Use
- Public Facilities
- Document Description
- Addendum to the existing Mitigated Negative Declaration for obtaining financial assistance through the Local Resources program administered by Metropolitan Water District of Southern California for expansion of treatment and pumping facilities at the existing Water Reclamation Plant, replacement of new 9 miles of transmission and distribution pipelines throughout the City's service area, construction of a reservoir facility and installation of a pressure reducing station to convert approximately 932 AFY existing and future domestic water use for irrigation to recycled water.
- Contact Information
-
David Rebensdorf
City of San Clemente
Lead/Public Agency
910 Calle Negocio
San Clemente, CA 92673
Phone : (949) 361-6130
rebensdorf@san-clemente.org
Location
- Cities
- San Clemente
- Counties
- Orange
- Regions
- Citywide
- Cross Streets
- City-wide
- State Highways
- I-5
- Railways
- OCTA
- Schools
- Capistrano USD
- Waterways
- Pacific Ocean
Notice of Determination
- Approving Agency
- City of San Clemente
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of San Clemente Engineering Division 910 Calle Negocio, Suite 100 City of San Clemente, CA 92673
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.