Master Case 11-028, DRP 11-005, OTP 11-005
Summary
SCH Number
2011079008
Lead Agency
City of Santa Clara
Document Title
Master Case 11-028, DRP 11-005, OTP 11-005
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2011
Document Description
The applicant, Related Companies, in collaboration with the City, requests the approval of a Development Review Permit and Oak Tree Permit to construct and operate a 30-unit, three-story apartment complex up to 37'-8" in height, on parcel 2833-016-900 of the project site, in the first phase of the project. The complex would consist of 2 and 3 bedroom units in four buildings, a tot lot, and surface level parking (and tuck-under-building parking) totaling 75 parking spaces. The 1.62 acre site is a paved, former Caltrans park and ride lot, with three oak trees, and two driveways and is zoned RM (Residential Moderate). The future phase 2 component of the project would include development of the western parcels (2833-016-044 and - 037) which would consist of 31 apartment units up to three-stories in height and a 7,500 square-foot commercial building. Both phases of the project have been analyzed as part of the Initial Study/Mitigated Negative Declaration prepared for this project.
Contact Information
Name
James Chow
Agency Name
City of Santa Clara
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Clara
Counties
Santa Clara
Other Location Info
23610 Newhall Avenue (APN: 2833-016-900)
Notice of Determination
Approving Agency
City of Santa Clarita
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.