Saddlebag Lake Geomembrane Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/21/2011
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 (SAA# 1600-2011-0182-R6) of the Fish and Game Code to the project Permittee, Southern California Edison Co. Permittee proposes to the install a geomembrane liner on the upstream face of Saddlebag Lake Dam, repair the deteriorated concrete areas along the dam face, conduct repairs to the outlet system, and fill a sinkhole that contributes to leakage. To conduct the project, Permittee will draw down Saddlebag lake prior to beginning work activities in the Fall of 2011, when lake levels are normally low and the dam face is exposed. The dam outlet valve will remain open for the duration of the project to allow natural flows to pas through Lee Vining Creek. The geomembrane will be installed using swingstages and minimal scaffolding. Work is proposed to begin in September, 2011 and is expected to take 90 days to complete.

Contact Information

Name
Tammy Branston
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Mono
Other Location Info
Saddlebag Lake

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301 (b)
Reasons for Exemption
Repairs and maintenance to an existing public utility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.