Banner-Taylor Reservoir Restoration Project

2 Documents in Project

Summary

SCH Number
2011072050
Lead Agency
Nevada Irrigation District
Document Title
Banner-Taylor Reservoir Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2011
Present Land Use
Public Land
Document Description
The NID Banner-Taylor Reservoirs are utilized as clear wells and a water storage facility for the E. George Treatment plant and as main storage and emergency reserve for the E. George system. NID proposes to replace the existing hypalon-covered, earthen Banner-Taylor Reservoirs with two storage tanks. The tanks may be concrete, concrete with aluminum top, hypalon covers, or hypalon lined with aluminum top with modification of existing onsite piping. The hypalon covers with installed in 1992 and the covers are badly deteriorated requiring replacement. Due to the current conditions of the covers, replacement of the covers needs to be performed as soon as possible. The project site is on 10 acres of NID property including staging areas. The proposed project area is located in Nevada County.

Contact Information

Name
Doug Roderick
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Grass Valley, Nevada City
Counties
Nevada
Cross Streets
Corner of Banner Lava Cap Road and Boreham Lane
Zip
95959
Total Acres
10
Parcel #
3713026000
State Highways
Hwy 49/20
Railways
No
Airports
Nevada County Airpark
Schools
Nevada Union HS
Waterways
Deer Creek
Township
16N
Range
9E
Section
19

Notice of Determination

Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.