East Zayante Retaining Wall

3 Documents in Project

Summary

SCH Number
2011072026
Lead Agency
Santa Cruz County
Document Title
East Zayante Retaining Wall
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2011
Present Land Use
Right of Way / Riparian Corridor
Document Description
This project includes construction of a retaining wall to repair approximately 40 feet of failed road embankment approximately 40 feet above Zayante Creek, near the town of Felton, Santa Cruz County. The proposed retaining wall will consist of a 72.5 foot long by 35 foot tall tieback soldier pile wall with timber lagging. Metal beam guard railing (MBGR) will be placed along the top of the wall for vehicle protection. Approximately 93 feet of asphalt concrete in the outboard lane on the top of the wall for vehicle protection. Approximately 93 feet of asphalt concrete in the outboard lane on Zayante Road will be reconstructed and replaced. The roadside ditch will be lined with asphalt to reduce seepage under the roadway toward the proposed wall. Scour protection will be placed along the length of the wall. Approximately 150 linear feet of Zayante Creek will be diverted around the project site with a bypass/dewatering system. California Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement Number 1600-2011-0065-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Santa Cruz County.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Quail Hollow Road and East Zayante Road
Zip
95018
Parcel #
074-181-01
State Highways
Hwy 9
Waterways
Zayante Creek
Other Location Info
City/Nearest Community: Felton

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print