Glorietta Storm Drain Improvements

3 Documents in Project

Summary

SCH Number
2011072022
Lead Agency
Orinda, City of (City of Orinda)
Document Title
Glorietta Storm Drain Improvements
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of improvements to the drainage culvert to improve flow, including: rehabilitation of the approximately 425 foot long upstream segment (installation of a new lining and headwall); replacement of the approximately 320 foot long downstream segment (with a new reinforced concrete pipe); and placement of rock slope protection, grading and lowering of the creek channel in places, and placement of botanical erosion control mat downstream of the outfall. These improvements would serve to prevent potential future flooding and possible structural collapse of the pipe.

Contact Information
Paul Lang
City of Orinda
22 Orinda Way
Orinda, CA 94563

925 253 4244

Location

Coordinates
37°41'44"N 122°10'6"W
Cities
Orinda
Counties
Contra Costa
Cross Streets
Glorietta Boulevard/Moraga Way
Zip
94563
State Highways
Hwy 24
Schools
Glorietta ES
Waterways
unnamed tributary to San Pablo Creek

Notice of Determination

Approving Agency
City of Orinda
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search