Breuner Marsh Restoration and Public Access Project

6 Documents in Project

Summary

SCH Number
2011072011
Lead Agency
East Bay Regional Parks District
Document Title
Breuner Marsh Restoration and Public Access Project
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2013
Present Land Use
Natural Conservation Area
Document Description
The California Department of Fish and Game (DFG) are executing Lake and Streambed Alteration Agreement Number 1600-2012-0423-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, the East Bay Regional Park District. The project is located at Rheem Creek, in the City of Richmond, at the northern terminus of Goodrick Avenue, immediately north of Richmond Parkway. The project, as defined under Section 1602, is limited to installation of a new free-span pedestrian bridge over Rheem Creek, and demolition and removal an existing concrete box culvert. The new bridge will be located approximately 300 feet upstream from the existing box culvert and will consist of a 16-foot-wide by 90-foot-long steel truss structure. The concrete abutments will be placed above the top of bank. The new bridge will span the 100-year floodplain and will provide approximately three feet of clearance over the 100-year flood surface elevation.

Contact Information

Name
Randi Adair
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
Goodrick Avenue
Zip
94806
Total Acres
150
Parcel #
408100032, 31; 405010019, 20, 17
State Highways
I-80
Railways
UPRR
Airports
No
Schools
CCUSD Bayview, Lake
Waterways
San Pablo Bay, Rheem Creek

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.