Bender Ready-Mix Concrete Manufacturing Project

2 Documents in Project

Summary

SCH Number
2011071071
Lead Agency
City of Santa Ana
Document Title
Bender Ready-Mix Concrete Manufacturing Project
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2011
Present Land Use
The City of Santa Ana General Plan designation for the project site is "Industrial" (IND). The City of Santa Ana Zoning Ordinance designation for the site is "Heavy Industrial" (M2).
Document Description
The proposed project would include a range of aesthetic, drainage, water quality, and safety improvements at the existing Bender Ready-Mix concrete manufacturing facility. It is important to note that the project applicant does not propose to alter operations or facilities at the site beyond what is required by the City to meet CUP and Municipal Code requirements. Aesthetic improvements would include landscaping, a new block wall, aesthetic screening, and signage. Drainage/water quality improvements would consist of a detention/desilting basin and on-site drainage conveyance facilities. Safety improvements would include fencing and the repaving of South Santa Fe Street along the project frontage.

Contact Information

Name
Vince Fregoso
Agency Name
City of Santa Ana
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange
Cross Streets
South Santa Fe Street/East Chestnut Avenue
Zip
92705
Total Acres
.97
Parcel #
011-311-09, 10
State Highways
SR-55, I-5
Railways
Yes
Schools
Yes
Township
5S
Range
9W
Base
SBB&M

Notice of Determination

Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print