Stuart Street Water Tanks Replacement Project: IS-MND Addendum

3 Documents in Project

Summary

SCH Number
2011071060
Lead Agency
Cambria Community Services District
Document Title
Stuart Street Water Tanks Replacement Project: IS-MND Addendum
Document Type
NOD - Notice of Determination
Received
Posted
8/22/2024
Document Description
The project would involve the like-for-like replacement of two water tanks (Tank 1 and Tank 2). The Tank 1 replacement would be constructed on the existing Tank 2 site, while the Tank 2 replacement would be constructed on the existing Tank 1 site. This replacement would remediate current operational deficiencies, conform to current seismic design criteria, and would not increase capacity. An Addendum to the previous 2015 IS-MND was prepared to address changes to the project design.

Contact Information

Name
James Green
Agency Name
Cambria Community services District
Job Title
Utility Director
Contact Types
Lead/Public Agency

Location

Cities
Cambria
Counties
San Luis Obispo
Regions
Southern California, Unincorporated
Cross Streets
Lawson Place and Richard Street
Zip
93428
Total Acres
.33 Acres
Parcel #
024-142-043
State Highways
California
Railways
none
Airports
none
Schools
Two
Waterways
Two
Township
T27S
Range
R09E
Section
00

Notice of Determination

Approving Agency
Cambria Community Services District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Luis Obispo
Final Environmental Document Available at
cambriacsd.org

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print