Fresno County Service Area 34 Winchell Cove Pipeline Project

5 Documents in Project

Summary

SCH Number
2011071042
Lead Agency
Fresno County
Document Title
Fresno County Service Area 34 Winchell Cove Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2013
Present Land Use
Grazing/AL-40/Agriculture
Document Description
The project located within and in the immediate vicinity of Millerton Lake State Recreation Area (MLSRA), in Fresno County, California, purposes from Phase I of County Service Area (CSA) 34 Millerton Lake Pumps and Pipeline Maintenance Project and involves construction of a parallel pipeline extending from the Winchell Cove submerged pump station. The new pipeline would branch from where the existing pipeline reduces from 14 to 12 inches diameter or at the blind flange, on either side of the platform, and would run parallel with the existing CSA 34 12-inch pipeline. From the pumps, the pipeline would extend fro approximately 0.56 miles through the Millerton Lake bed to the Winchell Cove Marina.

Contact Information

Name
Ejaz Ahmad
Agency Name
Fresno County Department of Public Works & Planning
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Cross Streets
Millerton Road
Zip
93721
Parcel #
Various
State Highways
Hwy 41
Township
11S
Range
21E
Section
10,11
Base
MDB&M

Notice of Determination

Approving Agency
County of Fresno
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print