20-Year Comprehensive Water Master Plan Project

2 Documents in Project

Summary

SCH Number
2011071032
Lead Agency
City of Victorville
Document Title
20-Year Comprehensive Water Master Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
10/21/2011
Document Description
The Victorville Water District's 20-Year Comprehensive Water Master Plan (WMP) defines the water supply and water infrastructure system components required to meet the 2030 water demand within the District's service area, which includes two hydraulically separated water systems, Improvement District 1 and Improvement District 2. VWD obtains all of its water supplies from local groundwater wells. The systems consists of the two improvement district containing seven primary pressure zones, three sub-zones, and one small isolated pressure zone. The entire district presently serves approximately 119,500 customers within the approximately square mile service area. The Victorville Water District WMP envisions the expansion or installation of the following facilities: new pipelines, new pressure reducing stations, new reservoirs, new groundwater wells, the R^3 project, and the acquisition of well and reservoir sites. The expansion and installation of the required infrastructure and future operation of the modified system through 2030 is the project being evaluated in this environmental document.

Contact Information

Name
Christy Stevens
Agency Name
City of Victorville
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Total Acres
85
State Highways
Hwy 15
Airports
SCLA

Notice of Determination

Approving Agency
City of Victorville
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print