East Bay Regional Park District Programmatic Routine Maintenance Projects

Summary

SCH Number
2011068219
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
East Bay Regional Park District Programmatic Routine Maintenance Projects
Document Type
NOE - Notice of Exemption
Received
Posted
6/28/2011
Document Description
The Programmatic Routine Maintenance Project includes: replacement and upgrade of existing culverts; installation of culvert head and tail walls; installation of culvert discharge plates/energy dissipaters; installation of articulated concrete fords; maintenance of existing rock fords; bank stabilization including replacement of rip-rap, installing log crib walls, natural rock weirs, vegetable and riparian planting and other bio-engineering techniques; debris removal; removal of man-made imbedded debris; maintenance of existing bridges; installation of foot and equestrian bridges; routine maintenance dredging of ponds and lakes; maintenance of existing shoreline facilities including docks, fishing piers, boat launches, boardwalks, and overlooks.

Contact Information

Name
Skyler C. Anderson
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Counties
Alameda, Contra Costa
Regions
Unincorporated

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301-15304; 15333
Reasons for Exemption
The CVWB determined that this project meets the Categorical Exemptions criteria under Title 14, Section 15301-15304, & 15333 of the CA Code of Regulations.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print