Integrated Greenhorn Creek Restoration Project

3 Documents in Project

Summary

SCH Number
2011062025
Lead Agency
Plumas County
Document Title
Integrated Greenhorn Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2013
Present Land Use
AP, GA, S-3, FP, Sp-ScA, SP-ScR, MH
Document Description
The Plumas Corporation has requested $341,000 from the Sierra Nevada Conservancy's Proposition 84 Preservation of Ranches and Agricultural Lands Grant Program for the treatment of 13.6-acres of aquatic and riparian habitat and 2,270 feet of stream channel at four sites along Greenhorn Creek using bank sloping, boulder vanes, and fish passage structures. The proposed project would construct bank stabilization treatments in two of the treatment areas; this would involve laying back six to eight feet high eroding banks to a 2:1 slope, vegetating the banks, and installing boulder vanes. Two fish passage treatments are located at the Reid and Shea agricultural irrigation dams, treatment at these two locations would involve placing rock channel and floodplain structures at five percent grade by building a series of riffles and pools in the channel and a rocked floodplain that would carry over-banking flood flows.

Contact Information

Name
Jim Branham
Agency Name
DFG, Sacramento Valley & Sierra Region
Contact Types
Lead/Public Agency

Location

Cities
Quincy
Counties
Plumas
Cross Streets
Hwy 70, Chandler Road, Quincy Junction Road
Zip
95971
Parcel #
117160010, 117160030, 117210017, 117160029, 117140USA, 117070037, 117120012, 117120013, 00546009
Township
24N
Range
10E
Section
7-8,16
Base
MDB&M
Other Information
Parcel Cont.: 005290051, 117070032 Section Cont.: 17, 21

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print