Upper Penitecia Creek Improvement Project

3 Documents in Project

Summary

SCH Number
2011062020
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Upper Penitecia Creek Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2011
Present Land Use
Commercial Pedestrian & Industrial Park Zoning. Light Industrial & Combined Industrial/Commercial General Plan Designation
Document Description
The proposed project would create a creek channel sized to convey the approximate annual flood, a high-flow channel to convey sediment and water during floods greater than the annual flood, and a floodplain sized to convey the 2-year recurrence interval flood. The proposed project would realign Upper Penitencia Creek to the southwest away from commercial and residential property along the eastern edge of the creek corridor. This realignment would result in the removal of approximately 2 acres of impervious parking lot area and improve the existing highly degraded condition of the eastern and northern banks of the creek. Further, the proposed project would provide floodplain storage, remove non-native vegetation, revegetate with native wetland and riparian plantings, and enhance and restore natural creek functions and values. Cross streets are Berryessa Road and North King Road (Parcel #254-17-063. The California Department of Fish and Game is executing a Lake or Streambed Alteration Agreement Number 1600-2011-0303-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Ann Calnan, Santa Clara Valley Transportation Authority.

Contact Information

Name
Dave Johnston
Agency Name
DFG, Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Berryessa Road and North King Road
Zip
95132
Total Acres
3.8
Parcel #
254-17-063
State Highways
U.S. 101 and I-880
Schools
12
Waterways
Upper Penitencia Creek, Coyote Creek

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print