Berg Holdings c/o J.T. Wick
4 Documents in Project
Summary
SCH Number
2011062013
Lead Agency
Sonoma County
Document Title
Berg Holdings c/o J.T. Wick
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2011
Present Land Use
Port Sonoma property (APN 068-140-026, 270 Hwy 37, Petaluma): GPD - Recreation and Visitor Serving Commercial; Z: K (Recreation and Visitor Serving Commercial) - F2 (Flood Plain) - SR (Scenic Resource) district, and Carneros River Ranch property (APN 068-130-013, 3900 Hwy 37, Petaluma): GPD - Land Extensive Agriculture 100 acre density; Zoned LEA - B6 - 100 acre density - Z (Second Unit Exclusion) - BR - SR - F2 district
Document Description
Request for agricultural enhancement by elevating existing agricultural fields located behind 10 foot high levees from approximately one foot below sea level to approximately seven feet above sea level (after compaction), and eleven feet above sea level (after compaction) for future building pad areas, on a 528 acre parcel, through importation over approximately 20 years via barge and trucks of up to 9,274,000 cubic yards (measured dry) or up to 18,548,000 cubic yards (measured wet) of dredge/fill material, with a maximum annual importation rate of 900,000 cubic yards wet via barge and 200,000 cubic yards dry via truck. Barge ofloading to occur at Port Sonoma, and fill to occur at adjacent 528 acre Carneros River Ranch. The State Lands Commission action is a 5-year Dredging Lease through October 26, 2016, to remove a maximum of 8,000 cubic yards of material annually.
Contact Information
Name
Kenneth Ellison
Agency Name
Sonoma County Permit and Resource Management
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Petaluma, Santa Rosa
Counties
Sonoma
Cross Streets
Hwy 37 and Lakeville Rd
Zip
94954
Total Acres
528
Parcel #
068-130-013, 068-140-026
State Highways
Hwy 37
Railways
NWP
Airports
No
Schools
No
Waterways
Petaluma and San Pablo Bay
Township
3N
Range
6W
Section
11
Base
MDB&M
Notice of Determination
Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.