Bijou Erosion Control Project, Phase 1 - Award of Acquisition Grant and Long-Term License Agreement with the City of South Lake Tahoe

6 Documents in Project

Summary

SCH Number
2011062012
Lead Agency
City of South Lake Tahoe
Document Title
Bijou Erosion Control Project, Phase 1 - Award of Acquisition Grant and Long-Term License Agreement with the City of South Lake Tahoe
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2012
Present Land Use
Residential, Commercial, Open Space, Recreation
Document Description
The proposed project involves replacement of the existing undersized and deteriorated Bijou Creek culvert, the new culvert would convey runoff from the upper watershed directly to the lake and eliminate the mixing of these flows and urban runoff. The runoff from the Commercial Core would be collected in a new collection and pretreatment system before being pumped into a series of infiltration basins in the upper watershed. The culvert system extends approximately 1,200 linear feet from the north end of Bijou Meadow to its outfall at the south shore of Lake Tahoe. The existing system consists of a combination of surface channel segments and buried storm drains/culverts. Bijou Creek flows into two 48-inch-diamter drainage pipes south of the intersection of Fairway Drive and Fairway Avenue, and then into a double-box concrete culvert along Fairway Drive. The system crosses under U.S. 50 in two 30-inch-diamter drainage pipes. North of the highway, flow is conveyed to Lake Tahoe in a 57-by-38-inch culvert. The proposed project would remove all of these existing components.

Contact Information

Name
Patrick Moeszinger
Agency Name
Department of Fish and Game (DFG)
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Hwy 50 & Fairway Avenue
Zip
96150
Total Acres
32
Parcel #
Numerous
State Highways
Hwy 50
Railways
No
Airports
No
Schools
No
Waterways
Bijou Creek & Lake Tahoe
Township
13N
Range
18E
Section
33

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes