Bijou Area Erosion Control Project - Phase 1
6 Documents in Project
Summary
SCH Number
2011062012
Lead Agency
City of South Lake Tahoe
Document Title
Bijou Area Erosion Control Project - Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2011
Present Land Use
Residential, Commercial, Open Space, Recreation
Document Description
The proposed Project involves construction and operation of major storm water management improvements for the Bijou Creek watershed. One component of the Project is replacement of the bijou Creek culvert from Fairway Drive, beneath the Bijou Center, and to the outfall at Lake Tahoe. The new 7 - by 2.5-foot precast concrete double box culvert will replace the existing deteriorated system, improving flow conveyance and reliability. The proposed Project also includes construction of a storm water collection and treatment system for runoff from the urbanized Bijou Commercial Core. The new system consists of storm drains, treatment vaults, and a pumping station. Following pretreatment of storm water in the treatment vaults, the water would be pumped in a force main to a series of five infiltration basins located on U.S. Forest Service parcels (near Walkup Road and Woodland Road). The design of the basins includes a subsurface piping system that would allow the basins to be drained to Bijou Meadow.
Contact Information
Name
Sarah Hussong-Johnson
Agency Name
City of South Lake
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Hwy 50 & Fairway Avenue
Zip
96150
Total Acres
32
Parcel #
Numerous
State Highways
Hwy 50
Railways
No
Airports
No
Schools
No
Waterways
Bijou Creek & Lake Tahoe
Township
13N
Range
18E
Section
33
Notice of Determination
Approving Agency
City of South Lake Tahoe
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes