Henning Minor Subdivision, 3200 21122 (TPM) & 3910 08-19-005 (ER)

7 Documents in Project

Summary

SCH Number
2011061062
Lead Agency
San Diego County
Document Title
Henning Minor Subdivision, 3200 21122 (TPM) & 3910 08-19-005 (ER)
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2011
Present Land Use
Multiple
Document Description
The project is a three (3) lot minor residential subdivision of a 5.2 acre parcel. The project site is located on Proctor Valley Road in the Jamul/Dulzura Community Plan area, within the unincorporated San Diego County. The site is subject to the General plan Regional Category Semi-Rural Lands, Land Use Designation (SR1) Semi Rural Residential, requiring a gross minimum parcel size of one, two, or four acres depending on slope. Zoning for the site is RR, Rural Residential, requiring a net minimum parcel size of one (1) existing garage that is to be removed. Access would be provided by a private road connecting to proctor Valley Road. The project would be served by on-site septic systems and imported water from the Otay Water District. No extension of sewer or water utilities will be required by the project. Earthwork will consist of cut and fill of 800 cubic yards of material.

Contact Information

Name
Larry Henning
Agency Name
San Diego County, Dept. of Planning & Land Use, M.S. O650
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Carlsbad Hydrologic Unit
Zip
Multiple
Total Acres
66 sq miles
Parcel #
Multiple
State Highways
I-15
Railways
LRT-Sprinter
Airports
No
Schools
Multiple
Waterways
Escondido Creek, Lake Wolhford
Township
11S
Range
2W
Section
28

Notice of Determination

Approving Agency
County of San Diego Director of the Dept. of Planning & Land Use
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.