Reservoir No. 1 Reconstruction Project

4 Documents in Project

Summary

SCH Number
2011061060
Lead Agency
City of Burbank
Document Title
Reservoir No. 1 Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2011
Present Land Use
GPD: Mountain Reserve Z: Open Space (OS)
Document Description
Burbank Water & power (BWP) proposes to demolish the existing 6.9-million-gallon (MG) Reservoir No. 1 and construct two new, cast-in-place concrete reservoirs with a total storage capacity of approximately 9.5 MG (Reservoir No. 1A with a capacity of approximately 4.8 MG and Reservoir No. 1B with a capacity of approximately 4.7 MG). This design would consist of two conventional reinforced concrete reservoirs constructed within the footprint of the original reservoir. The larger of the two reservoirs, reservoir No. 1A, located on the northwestern half of the site would be rectangular in shape. The smaller of the two reservoirs, Reservoir No. 1B, located on the southeast half of the site would be trapezoidal in shape.

Contact Information

Name
Michael Thompson
Agency Name
City of Burbank
Contact Types
Lead/Public Agency

Location

Cities
Burbank
Counties
Los Angeles
Cross Streets
Sunset Canyon Dr. & E. Magnolia Blvd.
Zip
91502
State Highways
Hwy 5
Railways
Metrolink
Schools
various public school campuses along proposed alignments
Waterways
No

Notice of Determination

Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print