Conveyance of Non-Project Water to Kern County Water Agency (SWP #23031)
14 Documents in Project
Summary
SCH Number
2011061057
Lead Agency
San Joaquin River Exchange Contractors Water Authority
Document Title
Conveyance of Non-Project Water to Kern County Water Agency (SWP #23031)
Document Type
NOD - Notice of Determination
Received
Posted
10/3/2023
Document Description
This project is for the conveyance of up to 20,000 acre-feet of the San Joaquin River Exchange Contractors Water Authority’s 2023 CVP water (Non-Project Water) to KCWA under Article 55 of KCWA’s Water Supply Contract with DWR. This Non-Project Water will be delivered to Rosedale-Rio Bravo Water Storage District, a member unit of KCWA, which lies within both the SWP and CVP places of use. This Non-Project Water will be made available by the United States Bureau of Reclamation to DWR at O’Neill Forebay for subsequent delivery by DWR to KCWA’s service area through December 31, 2023.
Contact Information
Name
Patrick Luzuriaga
Agency Name
Department of Water Resources
Job Title
Section Manager
Contact Types
Responsible Agency
Phone
Location
Counties
Kern
Regions
Countywide
Other Location Info
From O’Neill Forebay to Kern County Water Agency’s (KCWA) turnout(s) in Reaches 12E and 13B of the California Aqueduct; Kern County
Notice of Determination
Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
San Joaquin River Exchange Contractors Water Authority, 541 H Street, Los Banos, CA 93635.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.