Standby Generator Replacement Construction Phase at Eagle Mountain Pumping Plant and Final Design of the Delivery Pipes Expansion Joint Repairs at the Hinds, Ge

Summary

SCH Number
2011058181
Public Agency
Metropolitan Water District of Southern California
Document Title
Standby Generator Replacement Construction Phase at Eagle Mountain Pumping Plant and Final Design of the Delivery Pipes Expansion Joint Repairs at the Hinds, Ge
Document Type
NOE - Notice of Exemption
Received
Posted
5/18/2011
Document Description
1) Replacement of the standby generator at Eagle Mountain Pumping Plant, and 2) final design to repair expansion joints on the delivery pipes at Hinds, Gene and Intake Pumping Plants.

Contact Information

Name
Michael Melanson
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Counties
Riverside, San Bernardino
Other Location Info
Desert Center

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, 2; Sec. 15301, 15302
Reasons for Exemption
The proposed project consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographic features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. The proposed project consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print