Bear Creek Inlet Structure Gate Automation

Summary

SCH Number
2011058085
Public Agency
Stevinson Water District
Document Title
Bear Creek Inlet Structure Gate Automation
Document Type
NOE - Notice of Exemption
Received
Posted
5/10/2011
Document Description
This project replaces a manually operated gate on the Bear Creek Inlet Structure with an automated gate. This improvement allows the gate to be operated remotely and enables more responsive control of flows through the structure. The automation project does not affect the basic configuration of the structure, change its capacity, or alter its purpose. Beneficiaries include the Stevinson Water District and other entities along Bear Creek who will benefit from more responsive control of flood waters.

Contact Information

Name
Robert Kelley
Agency Name
Stevinson Water District
Contact Types
Lead/Public Agency

Location

Counties
Merced
Other Location Info
The project is located on Bear Creek immediately upstream of the location where Bear Creek flows over the East Side Canal Inverted siphon.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Art:19Sec:15301
Reasons for Exemption
This project is exempt because it rehabilitates an existing structure by replacing the original flashboard control with new equipment that conforms with current operational practices and improves the functioning of the facility (see attached as-built drawing and photographs of new gate installation).

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print