Palen Solar Power Project

7 Documents in Project

Summary

SCH Number
2011054002
Lead Agency
Riverside County
Document Title
Palen Solar Power Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project will be a 500 megawatt (MV) nominal capacity, AC Solar photovoltaic (PV) energy-generating facility and will cover approx. 3140 acres. They will use a single-axis tracking system (rotating east to west) and may use a variety of PV technologies, including, but not limited to Crystalline Silicon panels or copper Indium Gallium Selenide panels. Alternative 1 will have its solar arrays configured into two separate fields to avoid the desert wash woodland located in the center of the ROW with each solar field fenced separately. *See NOD for full details.

Contact Information
Magdalena Rodriguez
CDFW Inland
3602 Inland Empire Blvd Suite C-220
Ontario, CA 91764

909.844.2520

Location

Coordinates
33.70°'"N 115.22°'"W
Counties
Riverside
Total Acres
3,478
State Highways
I-10
Airports
Desert Center Airport
Other Location Info
City/Nearest Community: Desert Center

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3602 Inland Empire Blvd Suite C-220, Ontario, CA 91764

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search