Sutter Basin Flood Risk Management Project-Cypress Avenue to Tudor Road (Streambed Alteration Agreement No. 1600-2018-0083-R2)

5 Documents in Project

Summary

SCH Number
2011052085
Lead Agency
Sutter Butte Flood Control Agency (SBFCA)
Document Title
Sutter Basin Flood Risk Management Project-Cypress Avenue to Tudor Road (Streambed Alteration Agreement No. 1600-2018-0083-R2)
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2018
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0083-R2, pursuant to section 1600-2018-0083-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, The Sutter butte Flood Control Agency. Project consists of levee remediation measures, which includes the construction of slurry cutoff walls along the entire length of the levee within the Project boundaries (approx. 26,000 feet). Slurry cutoff wall are vertical walls approx. 3 feet wide, consisting of low hydraulic conductivity materials constructed through the levee embankment and foundation to cut off potential seepage through and under the levee. To install cutoff walls, the levee will be degraded by approx. 1/3 of its original height. Levee degrade material will be pushed to the side along the land and water sides of the levee to establish a working surface for heavy machinery. Cutoff walls will be constructed through the center of the levee and range in depth from 65 to 135 feet as measured from the levee working platform. The process creates a wall through the center of the levee with reduced permeability. After installation of the cutoff wall and the appropriate cutoff wall settlement period, the levee embankment will be reconstructed to its original lines and grades.

Contact Information

Name
Amy Kennedy
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Biggs, Gridley, Live Oak, Yuba City
Counties
Butte, Sutter
Cross Streets
Numerous
Zip
Numerous
Total Acres
1,000
Parcel #
Numerous
State Highways
Hwy 99
Railways
UPRR
Airports
Butte County
Schools
Numerous
Waterways
Feather River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print