Fourth Street Outfall and Storm Drain Replacement
2 Documents in Project
Summary
SCH Number
2011052076
Lead Agency
City of Santa Rosa
Document Title
Fourth Street Outfall and Storm Drain Replacement
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2012
Present Land Use
Right-of-way and undeveloped lot / Historic Planned Development & Downtown-5 Historic / Transit Village Mixed Use
Document Description
The project is to abandon and replace approximately 780 linear feet of an existing 24 inch clay storm drain pipe currently running from the intersection of 4th Street and Wilson Street in Railroad Square (Santa Rosa, CA) west to a new outfall to Santa Rosa Creek. 550 linear feet of the existing storm drain is severely deteriorated and is proposed to be slurry filled/or capped and abandoned in place in conformance with the City of Santa Rosa abandonment standards. The remaining 230 linear feet are proposed to be removed and replaced in the existing storm drain location. The existing outfall is proposed to be abandoned in compliance with the Sonoma County Water Agency standards and a new outfall is proposed to be constructed at a new location. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0002-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Steve Dittmer, City of San Rosa.
Contact Information
Name
Stephanie Buss
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Rosa
Counties
Sonoma
Cross Streets
Wilson Street
Zip
95404
Total Acres
.25
Parcel #
010-171-004, 010-171-012, 010-171
State Highways
Hwy 101 & 12
Railways
SMART Tracks
Airports
No
Schools
Burbank ES
Waterways
Santa Rosa Creek
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.